Due to the fact that Modares Highway is one of the most important highways in Tehran, it was not possible to close it, so it made construction operations very difficult.
Welding and assembly at a height of 40 meters above the Modares highway, along with winter rain and snow and summer heat, made the work of technicians and engineers very difficult.
The sanctions that the country was involved in, made it difficult to obtain materials.